Reconditioned 500 KVA Mine Power Center with the following major components:

  • 500 KVA Dry Transformer 13800-480Y/277 volt three phase
  • 15 KV Fusible Load Break Switch
  • Neutral Grounding Resistor
  • Startco SE 325 Neutral Ground Resistor Monitor
  • Westinghouse LAM3400 Feeder Circuit Breaker
  • 5 each Westinghouse KAM3225 Feeder Circuit Breakers
  • 6 each Pemco 21059 Ground Fault Ground Check Monitors
  • 5 KVA 480-120/240 volt Control Power Transformer and Panel