Four each 20’ High Cube Containers with the following equipment installed and wired for a Temporary Power Distribution Project:

  • Siemens 4000 amp Main Breaker Switchboard, 480Y/277 volt three phase, service entrance rated
  • Utility Meter Socket
  • Two each Siemens Panelboards 400 amp 480Y/277 volt three phase.
  • Siemens 225 KVA Dry Transformer 480-208Y/120 volt three phase.
  • Three each Siemens 400 amp 120Y/208 volt Panels
  • 2 each Steel Man Doors with Panic Hardware
  • Interior Lighting, Heat, and 120 volt Receptacles
  • Assorted Outdoor Receptacles